Proof
Built in Madhya Pradesh
First unit at Indore (2019), second at Smart Industrial Park, Pithampur (2022).
TODO(client): plant areas, machine list, test bed capacity, QC protocol and photography. This page is a proof page and ships only with confirmed facts.
